Skip to main content

Anniversary of the Modern Copenhagen Cycle Track

Happy Birthday Copenhagen Bike Lanes! 25 years of cycling safety
I made the above graphic back in 2008 to celebrate the 25th anniversary of the return of Copenhagen's separated cycle tracks.

Now it's 31 years on, but the anniversary is timeless.
Building Bike Lanes
It was in June 1983 that the Copenhagen cycle track returned to Copenhagen. Meaning cycle tracks separated from cars on one side and pedestrians on the other by curbs.

For the record, there were cycle tracks prior to this. Historically, separated cycle tracks criss-crossed Copenhagen but many were removed during the brain fart that was the 50s and 60s where planners decided the car was a good horse to back.

Marking Bike Lanes ca 1915
Here are the first bike lanes being marked out back in... 1915.

Building Bike Lanes in the 1930's
Here is a cycle track being constructed back in ... 1930.

But the return of the physically-separated cycle track in the modern era is a landmark. The City of Copenhagen made a visonary choice in implementing them. Cycling levels plummeted through the 50s and 60s from a peak in the late 1940s. By the late 60s, the modal share hit 9% after a high of 55%. Due... you guessed it... to infrastructure being removed to make space for cars.

Through the 1970s, the focus returned to the bicycle as a solution to transport problems. In 1983, the foundation was laid - in stone - for a return to rationality. Jens Kramer Mikkelsen, head of the traffic department (and later Lord Mayor) was responsible for the paradigm shift. A shift which continued unabated until today, where 41% of people arriving in the City of Copenhagen at work or education do so on bicycles. Of the citizens of Copenhagen municipality, the number is 55% who cycle every day. Only 12% drive cars.

On June 4, 1983 the Danish Cyclists' Union, at a large bicycle demonstration, gave a "Cyclist Award" to Mikkelsen in the form of a two metre long curb to symbolise the physical separation from traffic.

The cycle track was placed on the bike lane on Amagerbrogade at the corner of Hollænderdybet - just after Amagerboulevard - a sacred shrine for bike culture if anyone wants to start a'pilgrimage-ing.


The photo features the Cyclist Award and the two chaps who made it - stone mason Uffe Mohr [right] and his apprentice Egon Albertsen [left].

Popular posts from this blog

7550 New Bike Parking Spots at Copenhagen Central Station

For all of Copenhagen's badassness as a bicycle city, there remains one thing that the City still completely sucks at. Bicycle parking at train stations. At Copenhagen Central Station there are only about 1000 bike parking spots. Danish State Railways can't even tell us how many spots they have. They're not sure. Even in Basel they have 800+. In Antwerp they have this . Don't even get me started on the Dutch. 12,500 bike parking spots are on the way in some place called Utrecht . Amsterdam has a multi-story bike parking facility, floating bicycle barges round the back and are planning 7000 more spots underwater . Even at the nation's busiest train station, Nørreport, the recent and fancy redesign failed miserably in providing parking that is adequate for the demand . Architects once again failing to respond to actual urban needs. It is time to remedy that. Here is my design for 7550 bike parking spots behind Copenhagen Central Station. Steve C. Montebello i...

The New Question for 21st Century Cities

It's all so simple if we want it to be. For almost a century we have been asking the same question in our cities. "How many cars can we move down a street?" It's time to change the question. If you ask "How many PEOPLE can we move down a street?", the answer becomes much more modern and visionary. And simple. Oh, and cheaper. Let alone the fact that the model at the top can move 10 times more people down a street than the model at the bottom. When I travel with my Bicycle Urbanism by Design keynote , I often step on the toes of traffic engineers all around the world. Not all of them, however. I am always approached by engineers who are grateful that someone is questioning the unchanged nature of traffic engineering and the unmerited emphasis placed on it. I find it brilliant that individual traffic engineers in six different nations have all said the same thing to me: "We're problem solvers. But we're only ever asked to solve the sam...

Desire Line Analysis in Copenhagen's City Centre

Continuing in our series of Desire Line Analyses, we decided to cast our critical and curious eyes on yet another Copenhagen intersection, this time where Bremerholm meets Holmens Kanal. We decided to be more specific and focus on one part of the intersection - a location that we know well and one with a specific congestion problem in rush hour. We filmed for one hour from 08:15-09:15. Behaviour vs Design With the massive numbers of bicycle users in the mornings in Copenhagen, bottlenecks occur at a number of locations, particularly where many bicycle users need to turn left. This is something that all of us at the company experience each morning so we decided to study it. It was a November morning and it was party-cloudly, dry and 6 degrees C. The focus was to determine how bicycle users react to the sub-standard design of this location. How they react to having to battle with motorised traffic - something that is unusual in the city. Yep, even in Copenhagen, The Arroganc...